Wechat
EN
CN EN
 
EN
CASE
Multiple domestic and international engineering participants serving 168+cities.
Multiple domestic and international engineering participants serving 168+cities.
Multiple domestic and international engineering participants serving 168+cities.
G213 line Yingxiu to Dujiangyan Irrigation Project section



   
 Project Scale: The route starts from Shaohuoping Tunnel, passing through Yuzixi, Yingxiu, Mengzigou, Xiaohuanggou, Aba Aluminum Plant, Shuidagou, crossing the Yuewen Tunnel, and spanning the Shoujiang Bridge, connecting to the existing highway, passing through Qianjingou, Zhangjiagou, Mozigou, etc., and ending at the junction of Youyi Tunnel between Wenchuan and Dujiangyan Irrigation Project. The total length of the route is approximately 21.382KM. It adopts the standard of second-class highway, with a design speed of 40km/h, a subgrade width of 8.5m, a pavement width of 7.0m, a bridge design load of Highway-Class II, a tunnel construction clearance of 10×5m, and a pavement type of asphalt concrete.



TK-AP anti-corrosion airtight agent


Shaohuoping Tunnel, Yingxiu Town

Yingxiu Yuewen Tunnel Construction Site

The first pile foundation of Shoujiang Bridge was successfully poured


Main works of Xuankou Bridge
Sichuan Tieke New Building Materials Co., Ltd
add
Modern Avenue, Huaikou Town, Jintang County, Chengdu City, Sichuan Province, China
Call
+86-028-84910808
Email
sctieke@126.com

  • Scan with WeChat

  • Scan with WeChat