\

Project Introduction 

Project scale: the line is started from Shaohuoping Tunnel, which passes through Yuzixi, Yingxiu, Mengzigou, Xiaohuanggou, Aba Aluminum Plant, Shuidagou, Yuewen Tunnel and Shoujiang Bridge. Changshan Tunnel is connected with existing highway and passes through Qianjingou, Zhangjiagou, Mozigou, etc., which is ended in Wenchuan-Dujiangyan Intersection of Youyi Tunnel. Whole length of the line is about 21.382km. The tunnel is constructed according to grade II highway standards. Designed running speed is 40km/h. Roadbed width is 8.5 m, pavement width is 7.0 m, designed load of bridge is highway grade II, tunnel construction limit is 10*5m, and pavement model belongs to asphalt concrete.


Cooperation Contents

TK-AP anticorrosive airtight agent

Case Show

\
Shaohuoping Tunnel in Yingxiu Town
\
Yingxiu Yuewen Tunnel Construction Site\
Successful Grouting of the First Pile Foundation in Shoujiang Bridge
\
Main Work in Xuankou Bridge