

The third bid section of the newly-built Xi'an-Chengdu Passenger Dedicated Line. The main line spans from DK401+146 to DK431+660, with a total length of 30.295km. The main works of the main line include 21 bridges with a total length of 10.382km, accounting for 34.3% of the section length; 13 tunnels with a total length of 15.002km, accounting for 49.5% of the section length; 28 sections of subgrade and 1 station (Jianmenguan Station) with a total length of 4.911km, accounting for 16.2% of the section length. The main line starts from Fanjia Gully Tunnel DK401+146 in Baolun Town, Guangyuan City, passing through Bailong River, Qingjiang River, and Jianmenguan Station, and ends at Shitizi Middle Bridge DK431+660 in Guangyuan City. Railway grade: Passenger Dedicated Line; Number of main lines: Double-track

TK-PC high-performance water reducer


No. 1 inclined shaft of Maoxian Tunnel on the Xi'an-Chengdu Passenger Dedicated Line

Xi'an-Chengdu Passenger Dedicated Line Huxian Prefecture Beam Factory

